Stage 1 - Preliminary works
Bro Dyfi Community Renewables
Home
About BDCR
People Power! Our first wind turbine
Nordtank 500
Contact Us
Links
Stage 1 - Preliminary works
Creating the access track
Inspecting the construction access track
The new turbine arrives
Turbine blades arrive
Tower adapter plate
Milling the flanges on the tower adapter plate
Washing the turbine tower
Washing the blades
Slight problem getting the crane to site
We needed two winch trucks to recover the crane
Old style salvage equipment!
Recovering the crane
Crane making its way up to site
Crane arriving at site
Jacking up the crane